Chapter 182 Large-scale Project
Chapter 182 Large-scale Project
Through monitoring, we saw the kayak making a comeback.
Tons of salvaged materials were continuously transported back to Jingyuan Shelter.
That kind of super high transportation capacity.
This made Su Wu very excited.
It is not easy to get over the psychological barrier of exchanging human lives for supplies.
But by only wasting one or two percent of the materials, you can bring back a large amount of resources.
Then there really won't be any obstacles at all.
It is true and there is hope for the future.
In the face of facts.
Without much hesitation, Su Wu made a decision quickly.
As long as there are no major problems in the next two or three days of testing.
Then he immediately started the second round of expansion production of spider robots.
Increase it from the current number of 300 to 3300.
And the newly added part will be delivered to the remote control center for use.
Strictly speaking, this testing period was not wasted.
The manufacturing center is currently producing medium-sized hovercraft at full capacity.
Even if the production task is issued now.
It will take two or three days to queue up before we can actually start producing spider robots.
"Next."
“It’s time to start restoring the Lime Shelter.”
This is a substantial large-scale project.
When fully operational, the Lime Shelter has 110 million cubic meters of space.
It is divided into 5 floors, each with an area of more than 3 square meters, which is almost the size of ten football fields.
During the last super earthquake.
The entire first floor of the shelter was completely thrown from underground to the surface, and more than two-thirds of the building was destroyed.
The following four floors also have some problems to varying degrees.
The bottom layer was even squeezed to the point where only a few hundred square meters of space was left.
But even so.
If it is completely repaired.
The ultimate effective space that can be used for survival can still reach about 70 cubic meters.
In addition, considering that it is only 7.5 kilometers away from Su Wu’s farmhouse.
It is the nearest affiliated shelter.
Even if it is simply considered as an auxiliary warehouse, its restoration value is enormous.
Just before that.
Limited by manpower and resources.
Su Wu's own farmyard lacked cement, so it was impossible for him to provide much support.
For the lime shelter, minor repairs are the most that can be done.
If we can barely carve out an area inside that can guarantee basic living conditions, we will have accomplished the mission.
And now.
After receiving the legacy of dozens of shelters large and small.
The amount of cement rescued or temporarily sealed in waterproof warehouses reached tens of thousands of tons.
Su Wu already has the capital to carry out a large-scale renovation of the Lime Shelter.
Completely transform it into a complete shelter.
As for the labor required for restoration.
This is the thing Su Wu has the most right now.
Restoring the Lime Shelter is not a burden to him, but rather a channel to ease the pressure of excess labor.
"Medium-sized hovercraft present."
"When dispatching workers and materials there, there is basically no need to worry about safety issues."
"An additional 10,000 workers could be recruited for this purpose."
“Restoration work used to be done in shifts.”
“We will try to completely repair it within a week.”
Plans have been made for a large-scale project to restore the Lime Shelter.
The pile of affairs on Su Wu's hands have basically been cleared out.
Next.
He could safely devote most of his energy to the underground shelter in the farmyard.
Regarding this core shelter where his true body is located.
Although Su Wu did not dare to let the robot operated by the remote control center get involved.
But it can tilt a large amount of building materials such as cement, steel, etc.
And there is plenty of material.
The engineering team located on the 9th underground floor can operate at full capacity.
The construction progress was once again increased to more than twice the past level.
It is expected to take three days at most.
The 9th floor can be completed.
"almost."
"Wait until the 9th floor is completed."
"The size of the shelter has basically reached the upper limit of a small shelter."
"One step further, it should be a medium-sized shelter."
"By then, there will definitely be a phased reward."
There was some anticipation in Su Wu's eyes.
Based on his research on the doomsday system over such a long period of time.
By then, there will definitely be a huge reward.
The reward will most likely not even be survival points or ordinary items.
Instead, it will bring about an evolution in the rules of transformation.
Time, in the surging floods on the surface, the continuous heavy rains, and the labor and construction participated by hundreds of thousands of people underground.
Gradually flow backwards.
Su Wu has lived through the end of the world.
A rare period of stability and rapid development.
8 month 30 day.
Tens of thousands of construction workers arrived at the Green Lemon Shelter one after another on medium-sized hovercraft.
Start restoration work on it.
The construction of the first phase dormitory of Jingyuan Shelter was announced to be completed.
After waiting for the cement to solidify initially and simple decoration.
That evening, the first batch of 1 people began to move into the dormitories.
And they freed up space.
The construction of mushroom houses and earthworm breeding factories will begin simultaneously and seamlessly.
Expand the production of cheap food.
8 month 31 day.
The number of medium-sized hovercraft traveling through the ruins of surface cities has officially reached 30.
Nearly 3 tons of materials can be transported every day.
the same day.
After the Farmyard Manufacturing Center completed the production task of medium-sized hovercraft.
Immediately, production of spider robots resumed at a rate of 20 per hour.
These spider robots.
Once it leaves the production line, it will be immediately picked up by a Type 1 ore transport vehicle waiting outside.
Pull up to the lime shelter at the water's edge.
Then, it was delivered to the remote control center of Jingyuan Shelter on the spot along with the kayak and the accompanying humanoid service robot responsible for operating the kayak.
By the workers there.
They are remotely operated and put to work salvaging and transporting resources in flooded areas.
One to two million tons of supplies sealed in abandoned underwater shelters.
From then on, it began to decrease rapidly at a speed visible to the naked eye.
They are continuously transported to the corresponding shelter warehouses by medium-sized hovercraft and kayaks.
Su Wu's capital lies in this busy transportation of materials.
Gradually increase bit by bit.
Steadily approaching the standards of a super-large shelter.
9 month 1 day.
The remote control center uses a shift-based operator system.
Control thousands of spider robots and a corresponding number of kayaks to salvage underwater supplies day and night.
The efficiency of material transfer has been increased to a terrifying level of 3 tons per day.
And this is not the limit.
With the spider robots still rolling off the production line, and the newly produced kayaks.
In the near future.
Their daily transportation volume will exceed 70,000 tons.
(End of this chapter)